Cornwall Main Floor Renovation

A7R05066 HDR

Renovation Details

Total Project Cost

$180,000

Completion Date

December 2025

Design Timeline

8 weeks

Construction Timeline

12 weeks

City/Area

Cornwall

A7R05315 HDR

Before and After

Scope of Work:

This project showcases a complete main floor renovation, thoughtfully designed to enhance both flow and functionality. A key component of the transformation involved the removal of two partition walls, creating an open-concept layout that seamlessly connects the kitchen, living, and dining areas. The renovation encompassed the full kitchen, living room, dining room, primary bedroom, and main bathroom, with a cohesive design carried throughout the space. The kitchen serves as the centerpiece of the home, featuring custom two-tone cabinetry with dovetail drawer boxes, sleek quartz countertops, and warm white oak shelving. A ceramic tile backsplash and wide-plank white oak flooring add texture and durability while maintaining a clean, modern aesthetic. The main bathroom was reimagined as a spa-inspired retreat, complete with a custom walk-in shower featuring frameless glass, a built-in bench, and large-format tile. The space is complemented by a custom double-sink vanity and dedicated linen cabinetry, offering both elegance and practical storage. Additional highlights include a newly crafted oak staircase with custom railings, adding architectural character and tying the design elements together throughout the home.

TESTIMONIALS

Our Clients Say

google logo

Excellent

4.8

48 reviews

Ready to start your high-end renovation project?

Discover the endless possibilities with Millennial Contracting